EDF: Boron reconditioning and overflow systems
Cegelec CEM’s services cover the supply of two structures:
- Boron reconditioning system, installed outside the controlled area
- Boron overflow system in the boric acid preparation tanks, installed in the controlled area
Cegelec CEM is responsible for:
- Site expert assessments
- Design, sizing and installation studies
- Procurement and manufacture of systems
- Adjustment and factory testing
- Dismantling of existing stations
- Installation and commissioning
- Operator training in the operation and maintenance of the systems